欧美日韩视频精品一区二区,1024你懂的国产日韩欧美,精品国产一区二区三区香蕉事,91欧美精品综合在线观看,91在线精品麻豆欧美在线

<sup id="cf21z"></sup>
    • <menu id="cf21z"><rp id="cf21z"></rp></menu>
        • <menuitem id="cf21z"><dl id="cf21z"></dl></menuitem>
          • LJ External wall anti-alkali transparent primer

            PRODUCTS > LJ Coatings series > LJ External wall anti-alkali transparent primer

            LJ External wall anti-alkali transparent primer

            Feature
            Permeability and closure performance;
            Effectively prevent the precipitation of water soluble substance
            Improve the adhesive property and decorative durability of finishing coat;
            Save part of finishing paint
            Improve gloss and other properties

            Introduce

            The base material of the base material of imported special resin acrylic emulsion is adopted as the base material of the external wall anti-alkali closed permeability primer, which has super strong permeability, can reduce the water absorption of the base layer, and provides excellent adhesive force for all kinds of external wall base surface, it can save the consumption of finish paint, improve the glossiness of light paint, reduce the total cost of painting, and make the painting effect of wall surface better.

            Area Applicable.

            Building cement mortar, masonry structure, asbestos board, gypsum board and wood surface.

            Technical parameters

            Color: white translucent.

            Composition: acrylic polymer.

            Gloss: matte.

            Drying Time: surface drying: 2 hours.

            Re-coating time: at least 2 hours (25, 50% relative humidity ).

            Dry paint film thickness: 25 micrometers/layer.

            Theoretical paint consumption: 10 m2/L/floor, the actual construction area will vary depending on construction method, surface roughness and construction environment.

            Storage: Store in a cool and dry place above 0.

            Maintenance period: more than 5 days, the low temperature will be extended accordingly.

            Construction

            Construction method: brushing, roller coating, batch scraping and spraying.

            Dilution: dilute with water below 20%.

            Construction Environment: temperature not lower than 5, relative humidity not higher than 85%.

            Packing

            18KG/barrel